Construction Pictures from the NCWCP Site
|
|
|
|
Construction Pictures from the NCWCP Site
March 25, 2008
|
|
(Click on a picture to see the high resolution image.)
Back (north) wall showing progress with window installation. Note wraparound windows at the corner.
|
|
|
|
(Click on a picture to see the high resolution image.)
Windows being installed on east side of north wing
|
|
|
|
(Click on a picture to see the high resolution image.)
Window installation begins on south side of north wing
|
|
|
|
(Click on a picture to see the high resolution image.)
View looking west into atrium showing atrium roof
|
|
|
|
(Click on a picture to see the high resolution image.)
Front (south) side of NCWCP showing sloping roof extending over the NCEP Director's Office
|
|
|
|
(Click on a picture to see the high resolution image.)
Closer view of sloping roof.
|
|
|
|
(Click on a picture to see the high resolution image.)
Back (north) wall looking east. Parking garage is in the background.
|
|
|
|
(Click on a picture to see the high resolution image.)
View of west end of building looking up at the penthouse.
|
|
|
|
(Click on a picture to see the high resolution image.)
A wider view from the west showing the almost completely enclosed two story data center to the right.
|
|
|
|
(Click on a picture to see the high resolution image.)
Panel being prepared for placement on data center wall.
|
|
|
|
(Click on a picture to see the high resolution image.)
Another view of the front (south) side showing the auditorium walls to the right.
|
|
|
|
(Click on a picture to see the high resolution image.)
View from inside the atrium looking up towards its roof.
|
|
|
|
(Click on a picture to see the high resolution image.)
Looking up towards the atrium roof. The open area between the roof top and the first level below it will have windows to let the light into the atrium.
|
|
|
|
(Click on a picture to see the high resolution image.)
Interior view of first through third floor showing the vast network of pipes and duct work being installed.
|
|
|
|
(Click on a picture to see the high resolution image.)
View of conference center looking towards the auditorium
|
|
|
|
(Click on a picture to see the high resolution image.)
Overall view from entrance road.
|
|
|
|
|
The NOAA Center for Weather and Climate Prediction, will be located on a new 50-acre section
of the University of Maryland's M-Square Research and Technology Park.
Opus East, L.L.C., of Rockville, Md., working with Hellmuth, Obata +
Kassabaum, Inc. as the lead design and interior architect, will design,
construct and own the building and lease it to the GSA.
Opus arranged a long-term ground lease with the
University of Maryland
for the development. The 268,762 square-foot building will be the new home for NOAA.s Satellite and Information
Service, Air Resources Laboratory and the National Centers for Environmental Prediction.
Archive of building construction progress:
NCWCP Construction Picture Archive
|