Home > NCEP News Construction Pictures from the NCWCP Site
|
|
|
|
Construction Pictures from the NCWCP Site October 23, 2007
|
|
|
(Click on a picture to see the high resolution image.)
Parking garage progress.
|
|
|
|
(Click on a picture to see the high resolution image.)
Opposite end of parking structure.
|
|
|
|
(Click on a picture to see the high resolution image.)
Interior of atrium.
|
|
|
|
(Click on a picture to see the high resolution image.)
View of atrium from narrow (west) end. UMD building can be seen in the distance.
|
|
|
|
(Click on a picture to see the high resolution image.)
Interior view of first floor showing area designed for raised flooring.
|
|
|
|
(Click on a picture to see the high resolution image.)
Third floor at west end showing construction of pillars to support fourth floor.
|
|
|
|
(Click on a picture to see the high resolution image.)
Laying of rebar for third floor.
|
|
|
|
(Click on a picture to see the high resolution image.)
More views of third floor.
|
|
|
|
(Click on a picture to see the high resolution image.)
Smoothing and leveling of concrete on third floor.
|
|
|
|
(Click on a picture to see the high resolution image.)
View across first floor from front of building to rear at west end.
|
|
|
|
(Click on a picture to see the high resolution image.)
View from front entrance of building on first floor toward atrium. Scaffolding supports have been removed.
|
|
|
|
(Click on a picture to see the high resolution image.)
Hallway along conference rooms on first floor.
|
|
|
|
(Click on a picture to see the high resolution image.)
Future deli area in northeast corner of first floor.
|
|
|
|
(Click on a picture to see the high resolution image.)
Worker connects prefab sections of the parking garage. The truck in the foreground holds another section.
|
|
|
|
(Click on a picture to see the high resolution image.)
Stairway located near auditorium, poured on site.
|
|
|
|
(Click on a picture to see the high resolution image.)
South (front) side of NCWCP.
|
|
|
|
(Click on a picture to see the high resolution image.)
View of building site from roof of UMD building located to the east.
|
|
|
|
(Click on a picture to see the high resolution image.)
Closer view of building.
|
|
|
|
The NOAA Center for Weather and Climate Prediction, will be located on a new 50-acre section
of the University of Maryland's M-Square Research and Technology Park.
Opus East, L.L.C., of Rockville, Md., working with Hellmuth, Obata +
Kassabaum, Inc. as the lead design and interior architect, will design,
construct and own the building and lease it to the GSA.
Opus arranged a long-term ground lease with the
University of Maryland
for the development. The 268,762 square-foot building will be the new home for NOAA.s Satellite and Information
Service, Air Resources Laboratory and the National Centers for Environmental Prediction.
Archive of building construction progress:
NCWCP Construction Picture Archive
|