Construction Pictures from the NCWCP Site
|
|
Location of NCWCP site plan(University of Maryland website)
|
|
Construction Pictures from the NCWCP Site
September 11, 2008
|
|
(Click on a picture to see the high resolution image.)
Auditorium interior
|
|
|
|
(Click on a picture to see the high resolution image.)
Hallway through which employees may enter from the parking garage
|
|
|
|
(Click on a picture to see the high resolution image.)
Interior of library on first floor
|
|
|
|
(Click on a picture to see the high resolution image.)
Deli
|
|
|
|
(Click on a picture to see the high resolution image.)
EMC area on second floor
|
|
|
|
(Click on a picture to see the high resolution image.)
EMC area on second floor
|
|
|
|
(Click on a picture to see the high resolution image.)
John Derber checks out his office space on the second floor
|
|
|
|
(Click on a picture to see the high resolution image.)
Joint Center area
|
|
|
|
(Click on a picture to see the high resolution image.)
Third floor CPC area
|
|
|
|
(Click on a picture to see the high resolution image.)
Third floor CPC area
|
|
|
|
(Click on a picture to see the high resolution image.)
Fourth floor HPC/OPC ops area
|
|
|
|
(Click on a picture to see the high resolution image.)
Precarious work
|
|
|
|
(Click on a picture to see the high resolution image.)
NCEP Director's office
|
|
|
|
(Click on a picture to see the high resolution image.)
Roof on north wing
|
|
|
|
(Click on a picture to see the high resolution image.)
Equipment platform on north wing roof
|
|
|
|
(Click on a picture to see the high resolution image.)
Mechanical equipment on fifth floor. Water heaters are on the left.
|
|
|
|
(Click on a picture to see the high resolution image.)
Work on patio area outside of the deli
|
|
|
|
(Click on a picture to see the high resolution image.)
Atrium
|
|
|
|
(Click on a picture to see the high resolution image.)
South side of NCWCP; main entrance is just to the right of the center of the picture
|
|
|
|
(Click on a picture to see the high resolution image.)
West end of south side showing loading dock entrances
|
|
|
|
(Click on a picture to see the high resolution image.)
Rock wall under construction outside building entrance
|
|
|
|
|
The NOAA Center for Weather and Climate Prediction, will be located on a new 50-acre section
of the University of Maryland's M-Square Research and Technology Park.
Opus East, L.L.C., of Rockville, Md., working with Hellmuth, Obata +
Kassabaum, Inc. as the lead design and interior architect, will design,
construct and own the building and lease it to the GSA.
Opus arranged a long-term ground lease with the
University of Maryland
for the development. The 268,762 square-foot building will be the new home for NOAA.s Satellite and Information
Service, Air Resources Laboratory and the National Centers for Environmental Prediction.
Archive of building construction progress:
NCWCP Construction Picture Archive
|