Home > NCEP News
Construction Pictures from the NCWCP Site
|
|
|
|
Construction Pictures from the NCWCP Site
December 20, 2007
|
|
(Click on a picture to see the high resolution image.)
Front of building showing progress on roof
|
|
|
|
(Click on a picture to see the high resolution image.)
Rear wing with all four floors in place
|
|
|
|
(Click on a picture to see the high resolution image.)
Looking east into the atrium
|
|
|
|
(Click on a picture to see the high resolution image.)
Conference center area on first floor
|
|
|
|
(Click on a picture to see the high resolution image.)
Restroom area in conference center
|
|
|
|
(Click on a picture to see the high resolution image.)
Atrium area: holes in ceiling at right show where elevators will go
|
|
|
|
(Click on a picture to see the high resolution image.)
First floor: NCO area
|
|
|
|
(Click on a picture to see the high resolution image.)
EMC area on second floor
|
|
|
|
(Click on a picture to see the high resolution image.)
NESDIS area on second floor
|
|
|
|
(Click on a picture to see the high resolution image.)
CPC area on third floor
|
|
|
|
(Click on a picture to see the high resolution image.)
View of third floor NESDIS area and 4th floor with beginnings of roof
|
|
|
|
(Click on a picture to see the high resolution image.)
West end of fourth floor showing ARL area
|
|
|
|
(Click on a picture to see the high resolution image.)
ARL wet lab area
|
|
|
|
(Click on a picture to see the high resolution image.)
Cupola construction
|
|
|
|
(Click on a picture to see the high resolution image.)
Rig pumping up concrete for roof over fourth floor
|
|
|
|
(Click on a picture to see the high resolution image.)
Pipe spouting concrete on fourth floor roof
|
|
|
|
(Click on a picture to see the high resolution image.)
NCEP Director's office on the fourth floor
|
|
|
|
(Click on a picture to see the high resolution image.)
David Caldwell takes a call in Dr. Uccellini's office
|
|
|
|
(Click on a picture to see the high resolution image.)
North wing showing deli area (1st floor), EMC area (2nd floor), CPC area (3rd floor) and HPC/OPC ops area (4th floor). The parking garage is in the background.
|
|
|
|
(Click on a picture to see the high resolution image.)
Fourth floor ops area wrapped in preparation for inside work
|
|
|
|
(Click on a picture to see the high resolution image.)
Interior of atrium taken from second floor
|
|
|
|
(Click on a picture to see the high resolution image.)
Second floor NESDIS area in south east corner
|
|
|
|
(Click on a picture to see the high resolution image.)
View of southeast corner of building
|
|
|
|
(Click on a picture to see the high resolution image.)
Parking garage nearing completion
|
|
|
|
|
The NOAA Center for Weather and Climate Prediction, will be located on a new 50-acre section
of the University of Maryland's M-Square Research and Technology Park.
Opus East, L.L.C., of Rockville, Md., working with Hellmuth, Obata +
Kassabaum, Inc. as the lead design and interior architect, will design,
construct and own the building and lease it to the GSA.
Opus arranged a long-term ground lease with the
University of Maryland
for the development. The 268,762 square-foot building will be the new home for NOAA.s Satellite and Information
Service, Air Resources Laboratory and the National Centers for Environmental Prediction.
Archive of building construction progress:
NCWCP Construction Picture Archive
|