Home > NCEP News Construction Pictures from the NCWCP Site

Artist drawing of future NOAA Climate Weather Center
 

Construction Pictures from the NCWCP Site
January 29, 2008

 
Front view of NCWCP; note sloping roofline
(Click on a picture to see the high resolution image.)
Front view of NCWCP; note sloping roofline
 
 
 
Southeast corner of building with auditorium foundation in front, parking garage in rear and UMD building to the right.
(Click on a picture to see the high resolution image.)
Southeast corner of building with auditorium foundation in front, parking garage in rear and UMD building to the right.
 
 
 
Another view of the NCWCP showing the curve of the facade
(Click on a picture to see the high resolution image.)
Another view of the NCWCP showing the curve of the facade
 
 
 
Two story building extension which will house NCO and NESDIS computer systems
(Click on a picture to see the high resolution image.)
Two story building extension which will house NCO and NESDIS computer systems
 
 
 
View looking east through location of library on first floor into lobby area
(Click on a picture to see the high resolution image.)
View looking east through location of library on first floor into lobby area
 
 
 
Inside first floor area showing window storage area and installed ductwork
(Click on a picture to see the high resolution image.)
Inside first floor area showing window storage area and installed ductwork
 
 
 
Portable crane helping to install concrete exterior panels; note that permanent crane installed at beginning of construction has been removed.
(Click on a picture to see the high resolution image.)
Portable crane helping to install concrete exterior panels; note that permanent crane installed at beginning of construction has been removed.
 
 
 
View of atrium looking west
(Click on a picture to see the high resolution image.)
View of atrium looking west
 
 
 
Laying the remaining area of the first floor in the deli area; note the pipes being laid out prior to the pouring of the concrete
(Click on a picture to see the high resolution image.)
Laying the remaining area of the first floor in the deli area; note the pipes being laid out prior to the pouring of the concrete
 
 
 
Exterior facing nearing completion on back of building. Dave Feit oversees work.
(Click on a picture to see the high resolution image.)
Exterior facing nearing completion on back of building. Dave Feit oversees work.
 
 
 
Southwest corner of building
(Click on a picture to see the high resolution image.)
Southwest corner of building
 
 
 
Another view of back facade
(Click on a picture to see the high resolution image.)
Another view of back facade
 
 
 
Ductwork being installed on the 2nd floor
(Click on a picture to see the high resolution image.)
Ductwork being installed on the 2nd floor
 
 
 
Southwest corner of 2nd floor:  Joint Center for Satellite Data Assimilation area
(Click on a picture to see the high resolution image.)
Southwest corner of 2nd floor: Joint Center for Satellite Data Assimilation area
 
 
 
NESDIS area on 2nd floor
(Click on a picture to see the high resolution image.)
NESDIS area on 2nd floor
 
 
 
Connecting walkways between south and north wings. In the background a crane is lifting an exterior wall panel into place.
(Click on a picture to see the high resolution image.)
Connecting walkways between south and north wings. In the background a crane is lifting an exterior wall panel into place.
 
 
 
Bolt holding concrete facade panel to side of building
(Click on a picture to see the high resolution image.)
Bolt holding concrete facade panel to side of building
 
 
 
Another view of rear of building
(Click on a picture to see the high resolution image.)
Another view of rear of building
 
 
 
Third floor, north wing (CPC area)
(Click on a picture to see the high resolution image.)
Third floor, north wing (CPC area)
 
 
 
Third floor, south wing (NESDIS area)
(Click on a picture to see the high resolution image.)
Third floor, south wing (NESDIS area)
 
 
 
Hardware installed to hold cabling on third floor
(Click on a picture to see the high resolution image.)
Hardware installed to hold cabling on third floor
 
 
 
Dave Feit, Dave Caldwell and Kevin McCarthy take a stroll through the front office area of OPC/HPC
(Click on a picture to see the high resolution image.)
Dave Feit, Dave Caldwell and Kevin McCarthy take a stroll through the front office area of OPC/HPC
 
 
 
Looking west from NCEP Director's office area on 4th floor into the HPC/OPC office area
(Click on a picture to see the high resolution image.)
Looking west from NCEP Director's office area on 4th floor into the HPC/OPC office area
 
 
 
View of all four floors of north wing. Note facade panel being fastened into place
(Click on a picture to see the high resolution image.)
View of all four floors of north wing. Note facade panel being fastened into place
 
 
 
View to the south from the NCEP Director's office
(Click on a picture to see the high resolution image.)
View to the south from the NCEP Director's office
 
 
 
Fourth floor HPC/OPC operations area
(Click on a picture to see the high resolution image.)
Fourth floor HPC/OPC operations area
 
 
 
More of the fourth floor HPC/OPC operations area
(Click on a picture to see the high resolution image.)
More of the fourth floor HPC/OPC operations area
 
 
 
Looking west through the fourth floor ops area
(Click on a picture to see the high resolution image.)
Looking west through the fourth floor ops area
 
 
 
Roof area
(Click on a picture to see the high resolution image.)
Roof area
 
 
 
Fifth floor cupola area
(Click on a picture to see the high resolution image.)
Fifth floor cupola area
 
 
 
OPC's Dave Feit strikes a pose for posterity in front of the building
(Click on a picture to see the high resolution image.)
OPC's Dave Feit strikes a pose for posterity in front of the building
 
 
 
 

The NOAA Center for Weather and Climate Prediction, will be located on a new 50-acre section of the University of Maryland's M-Square Research and Technology Park. Opus East, L.L.C., of Rockville, Md., working with Hellmuth, Obata + Kassabaum, Inc. as the lead design and interior architect, will design, construct and own the building and lease it to the GSA.

Opus arranged a long-term ground lease with the University of Maryland for the development. The 268,762 square-foot building will be the new home for NOAA.s Satellite and Information Service, Air Resources Laboratory and the National Centers for Environmental Prediction.

Archive of building construction progress:


NOAA/ National Weather Service
National Centers for Environmental Prediction
5830 University Research Court
College Park, MD 20740
NCEP Internet Services Team
Disclaimer
Help
Glossary
Privacy Policy
About Us
Career Opportunities
Page last modified: Tuesday, 19-Jul-2011 14:26:12 UTC