Construction Pictures from the NCWCP Site
|
|
|
|
Construction Pictures from the NCWCP Site
April 11, 2008
|
|
(Click on a picture to see the high resolution image.)
View of building site from the parking lot of the UMD building. Parking garage is in the foreground with the NCWCP just visible in the background
|
|
|
|
(Click on a picture to see the high resolution image.)
Top level of parking garage
|
|
|
|
(Click on a picture to see the high resolution image.)
Putting final touches on the windows on the north (back) of the building
|
|
|
|
(Click on a picture to see the high resolution image.)
East side of building showing back (north) wing in foreground and front (south) wing in background
|
|
|
|
(Click on a picture to see the high resolution image.)
Front view with two story data center (red) to left and auditorium (gray) to right
|
|
|
|
(Click on a picture to see the high resolution image.)
View of back looking from west to east
|
|
|
|
(Click on a picture to see the high resolution image.)
West end of building
|
|
|
|
(Click on a picture to see the high resolution image.)
Second floor future location of EMC
|
|
|
|
(Click on a picture to see the high resolution image.)
View taken from fifth floor looking east along sloping roof
|
|
|
|
(Click on a picture to see the high resolution image.)
View of atrium from fifth floor
|
|
|
|
(Click on a picture to see the high resolution image.)
View of southeast area of 4th floor taken from fifth floor
|
|
|
|
(Click on a picture to see the high resolution image.)
View of atrium roof taken from roof of north (back) wing
|
|
|
|
(Click on a picture to see the high resolution image.)
Penthouse (5th floor) viewed from roof of back wing
|
|
|
|
(Click on a picture to see the high resolution image.)
View from roof of back wing showing sloping roofs of the front wing and the atrium
|
|
|
|
(Click on a picture to see the high resolution image.)
Another view of the atrium and front wing from the back wing roof
|
|
|
|
(Click on a picture to see the high resolution image.)
Overhead view of windows being prepared for front of building
|
|
|
|
(Click on a picture to see the high resolution image.)
Cmdr. Mark Moran, Chief Science Officer, tries the NCEP Director Office on for size
|
|
|
|
(Click on a picture to see the high resolution image.)
View across atrium bridge towards fourth floor operations area for OPC and HPC
|
|
|
|
(Click on a picture to see the high resolution image.)
Back of NCEP Director's office. Overhang is where roof will drain with a waterfall effect
|
|
|
|
(Click on a picture to see the high resolution image.)
Front exterior of NCWCP looking east from data center roof
|
|
|
|
(Click on a picture to see the high resolution image.)
Front exterior of NCWCP looking west from data center roof
|
|
|
|
(Click on a picture to see the high resolution image.)
Another view of the front looking east. The auditorium is to the right and the UMD building is in the background.
|
|
|
|
(Click on a picture to see the high resolution image.)
Windows awaiting installation for the building front.
|
|
|
|
(Click on a picture to see the high resolution image.)
Interior of auditorium looking at the stage area
|
|
|
|
(Click on a picture to see the high resolution image.)
Interior of auditorium looking at audience area
|
|
|
|
(Click on a picture to see the high resolution image.)
View of NCWCP building site from River Road
|
|
|
|
|
The NOAA Center for Weather and Climate Prediction, will be located on a new 50-acre section
of the University of Maryland's M-Square Research and Technology Park.
Opus East, L.L.C., of Rockville, Md., working with Hellmuth, Obata +
Kassabaum, Inc. as the lead design and interior architect, will design,
construct and own the building and lease it to the GSA.
Opus arranged a long-term ground lease with the
University of Maryland
for the development. The 268,762 square-foot building will be the new home for NOAA.s Satellite and Information
Service, Air Resources Laboratory and the National Centers for Environmental Prediction.
Archive of building construction progress:
NCWCP Construction Picture Archive
|